Tuesday, April 28, 2009

Here's where it's at

All the walls from the bathroom are removed. All the plumbing fixtures in the bathroom are removed. Next steps - replace outside faucet (cuz that's in Kaylee's ceiling and won't be accessible after remodeling and needs to be replaced); buy a tub/shower and run new water lines to install the tub/shower; install a fan in the bathroom (cuz it hasn't had one before).
View from the hallway. The doorway is Jacob's room. Kaylee's future room & the bathroom are all one big space currently.
View from Kaylee's room into the bathroom area. Now with the toilet & sink removed I can remove the wallpaper that was behind those so we can start putting the bathroom back together.

1 comment:

Cyndi said...

Wow, that space looks huge now. How are you going to set up the bathroom when it is all said and done?